Engineering and Architecture work by Executive Building Systems in New York City

Engineering · Architecture

Engineering & architecture

Design and field work under one roof, so an assessment turns straight into a scope and a scope turns straight into work.

Design and construction usually sit in different companies, and the gap between them is where cost and delay live. Keeping engineering and architectural coordination in house means the people describing the repair are the people who will build it, and a question raised on site gets answered the same day rather than in the next round of correspondence. Filings and permits are moved by people who deal with those counters regularly.

Scope

What this covers

Every item is performed by our own crews.

Architectural & Design

Complete architectural and design services, from concept drawings through code and zoning analysis to DOB approved construction documents signed and sealed by NYS registered professionals.

Engineering Services

Structural, MEP and facade engineering by licensed NYS Professional Engineers, including reports and signed and sealed drawings prepared to be accepted by the DOB rather than returned.

Full-Service Expediting

DOB, DOT, FDNY, Landmarks and DEP filings handled end to end: applications through DOB NOW, plan examination, objection resolution, permits, letters of completion and certificates of occupancy.

Permits Pulled

Every type of New York City permit pulled and tracked: alteration, demolition, plumbing, sprinkler and standpipe, boiler, mechanical, signage, sheds and after hours variances, with renewals kept current.

Project work

On site

Photography from the company's own projects.

Project building in New York
Project building
Project building in New York
Project building
Project building in New York
Project building
Project building in New York
Project building
Foundation work in New York
Foundation work
Concrete work in New York
Concrete work
Questions

Frequently asked

Yes. This category is carried out by our own crews rather than subcontracted, which is why we can commit to a schedule and to emergency response.

New York City across all five boroughs, plus Rockland and Westchester counties and the wider New York metropolitan area.

Yes. Permits, expediting and violation removal run alongside the field work on the same job, so the correction and the paperwork close out together.

Related

Other systems

Restoration work rarely stops at one system. These are the ones that most often run alongside it.

Get a price

Ask about engineering and architecture

Send the report, the violation or a photograph and you will get a straight answer.

24/7