Waterproofing Systems work by Executive Building Systems in New York City

Waterproofing Systems

Waterproofing systems

The envelope treated as one system, because water rarely gets in where it finally shows up.

Water is what turns a maintenance item into a structural one, and it very rarely enters a building at the point where the stain appears inside. That is why chasing the symptom wastes money. We work the roof, the parapet, the wall below it and the structure below grade together, and we detail the transitions between them, because transitions are where assemblies actually fail. The membrane and its terminations go in as the structure goes back together, which is the only point at which they can be done properly.

Scope

What this covers

Every item is performed by our own crews.

Waterproofing

Membranes, sealants and flashing at decks, walls, foundations and below grade space. The detailing at terminations and transitions is where the work is; the field of a membrane rarely fails on its own.

Traffic Membranes

Waterproofing membranes rated for vehicular traffic, applied over prepared decks and detailed through every penetration, so the surface that carries the cars is the surface that stops the water.

Waterproof Coatings

Applied coating systems for decks, walls and plaza areas, specified to the exposure and the substrate rather than to a catalog page.

Foundation Waterproofing

Below grade waterproofing at foundation walls, footings and slabs, with drainage, protection board and terminations detailed as the structure goes back together.

Joint Waterproofing

Movement joints, construction joints and transitions waterproofed with systems sized for the movement, because a joint that is sealed rigid simply moves the failure a few inches along.

Sealants

Sealant work across the building, from facade joints to deck and plaza work, with joint preparation, backing and tooling treated as part of the installation.

Joint Sealants

Working joints raked out, backed with the correct rod and sealed with a material sized for the movement across it. Joint width, depth and backing decide sealant life far more than the grade of the sealant.

Building Envelope Waterproofing

The envelope waterproofed as one system rather than trade by trade, so roof, parapet, wall and below grade work meet at detailed transitions instead of at a change of contractor.

Project work

On site

Photography from the company's own projects.

Foundation work in New York
Foundation wall waterproof · Foundation work
Vault work in New York
Vault underground · Vault work
Vault work in New York
Vault concrete box · Vault work
Project building in New York
Building metal green roof · Project building
Vault work in New York
Vault forms long run · Vault work
Vault work in New York
Vault steel forms · Vault work
Questions

Frequently asked

Yes. This category is carried out by our own crews rather than subcontracted, which is why we can commit to a schedule and to emergency response.

All five boroughs, Westchester, Long Island and out across the tri-state area, NY, NJ and CT.

Yes. Permits, expediting and violation removal run alongside the field work on the same job, so the correction and the paperwork close out together.

Related

Other systems

Restoration work rarely stops at one system. These are the ones that most often run alongside it.

Get a price

Ask about waterproofing systems

Send the report, the violation or a photograph and you will get a straight answer.

24/7